Black Desert Resort
Jan 15, 2026
Two boom pumps bring improved production and site logistics – exactly why Phaze Concrete brought in Brundage-Bone for this 1,400 cubic yard pour at the Black Desert Resort in Ivins Utah. BBCP operators Max Emmett and Colton Searle kept an Alliance 38-Meter and Schwing 46-Meter in sync throughout the pour. Thanks to Carson Graves for the photos.